Contact LitePoint Sales

Please provide your details below and LitePoint will be in touch within two business days.

Product Finder

Search products by wireless technology or standard you’re testing.

Supported Chipsets

Ready to test with more than 350 connectivity and cellular chipsets.

Learn About Testing 5G

IQgig-5G mmWave Test Solution Accelerates Economies of Scale in Manufacturing.

Register for our Next Webinar

LitePoint presents a series of webinars packed with the information you need for the complexities of testing the newest wireless technologies.

Worldwide Support

Software downloads & technical, or hardware support when you need it.

Partner Portal

Get access to partner programs, insights, & expert information.

Innovators Wanted

Experts in Wireless, Driven to Revolutionize. View Open Positions.

Contact Us

Give us a call or send us a message, our sales team is here to help.

Adaptive DPD Software

Digital Pre-Distortion tool in zScript

Adaptive Digital Pre-Distortion (DPD) is a software tool within the zScript test executive for power amplifier (PA) and front-end module (FEM) characterization and testing.

Many of the latest WLAN transceiver chipsets employ DPD techniques to improve PA linearity. DPD measures the nonlinearity of the PA, computes an inverse operation, and creates a pre-distorted RF signal that effectively linearizes the PA. In combination with the zSeries PA/FEM DVT Set, DPD is used to quantify improvements in spectral mask and Error Vector Magnitude (EVM) that will be possible with DPD in-circuit. DPD supports PA/FEM testing for IEEE 802.11 WLAN and LTE cellular devices.

In addition to our standard DPD tool, LitePoint has partnered with NanoSemi to provide a new Adaptive DPD for zSeries PA/FEM test solution. Adaptive DPD is targeted towards cellular PA testing with upgraded testing capabilities:

  • Adaptive learning step optimizes DPD engine for each specific PA architecture
  • Improves Adjacent Channel Leakage Power Ratio (ACLR)
  • Improves EVM
  • Superior performance compared to standard GMP/LUT based DPD
  • Crest Factor Reduction (CFR) algorithm achieves “close-to-minimum” EVM for target PAPR

Advantages

  • Quick and easy method to evaluate DPD effects for PA, FEM or transmitter designs
  • Automatic optimization of DPD algorithms for specific PA architectures
  • Out-of-the-box solutions, easy-to-use software